Communication for construction: Why is it important

With construction, scheduling is never going to be easy. With so many moving parts — and trying to get projects done as quickly and efficiently as possible — ensuring you have smooth sailing is key. 

That’s one hurdle the team at Strate Line Crane and Rigging is used to clearing. We work with a variety of companies, schedules and machinery to make sure the job is done. 

Pence Student UnionRecently, our team worked on renovating the Pence Student Union building at Eastern Washington University. 

The major renovations took place from the skeleton all the way throughout to the exterior, and included 10 thousand pound climate control units, located both above and below ground. 

Our team worked with ACI Northwest and Leone and Keeble, the general contractor on the project, to ensure that scheduling was communicated, and everyone could get their aspect of the project done when and where they needed to. 

Do you have a project with many moving parts, such as a commercial building or a government construction project? Our professionally certified rigging and crane operators are well-versed in communicating to get the job done. 

Contact Strate Line today or a free site visit and estimate. 

Back to Blog

Comments
Post a comment

Contact

Mailing Address
P.O. Box 280
Post Falls, ID 83877

Physical Address
26469 W. Highway 53
Hauser, ID 83854

Ph. (208) 659-7523
Fax. (208) 930-4724
Email. joe@stratelineinc.com

P.O. Box: 280
Post Falls
ID 83877
USA
http://www.stratelineinc.com/
26469 W. Highway 53 Hauser, ID 83854
Phone: (208) 659-7523